Bid Proposal Request Packet for Tamarron Water Line Repairs
August 30, 2023
Centerton Utilities is issuing a request for proposal on Service Line replacements within the Tamarron Subdivision along Amber Way and Sweetbriar Way. Request for pricing is for each street individually, as well as an option on pricing if both streets were to be combined into one bid. Service line replacements are to include approximately 50’ of service line for long side services and approximately 10’ of service line for short side services. Each service line replacement must include new gaskets on the corporation stop and meter can respectively.
The contractor will be required to adhere to Centerton Utilities specifications. The contractor will be required to communicate ANY water service or property disruption with the property residents PRIOR to the start of any work. Work cannot begin until 8 A.M. and all water services must be restored by 5 P.M. daily. All properties must be returned to their original condition as soon as possible.
Encasements are already in place on all long side services. However, due to potential meter can placement issues that may or may not exist, it is to be understood that some street and driveway repairs may be required with prior CWSD approval. It is also to be understood that the service line encasements have been underground for 15 years, there may or may not be an occasion where a bore is required. All street cuts and repairs must be coordinated with Centerton Street Department.
Please click the documents below for the Bid Proposal Request Packet for the Tamarron Water Line Repairs.
Tamarron RFP Request - Public Notice
Tamarron RFP Request - Additional Information
Tamarron Subdivision Aerial - Line Depths
Amber Way Addresses Information
Sweetbriar Way Addresses Information